General Project Management

Home Services

Major Works Undertaken (Status as on 30.09.2024)

S. No. Name of Project Assignment to SNPL Client Current Status
1 Sawalkot Hydroelectric Project (1856 MW) in Jammu and Kashmir Development of Construction Methodology and Review of Costs for DPR DMR Hydro Engineers P. L. Faridabad
Prime Assigner: Hindustan Construction Co., Mumbai
Commenced on: March 2013
Prime Assigner: Hindustan Construction Co., Mumbai
Submitted on: June 2013
DPR Submitted to CWC.
Reviews in Progress.
2 Ubahrah Small Hydroelectric Project (2.4 MW) in Chuwari, Chamba, HP Project Management - Construction Supervision, Quality Control, Contracts and Billing, Management, Procurement of Major Construction Material and Equipment Shakti Hydro Project Limited Commenced on: April 2013
The Project completed and commissioned on 18th Nov. 2014.
Design of additional water conducting system completed in March 2017.
Construction in progress.
3 Katende Hydroelectric Project (60 MW) Project Planning - Development of Construction Methodology, Equipment Planning, Manpower Planning Tractebel Engineering Pvt. Ltd. Delhi Commenced: April 2013
Submitted: June 2013
4 Chachyote Small Hydroelectric Project (3.5 MW) in Mandi, HP Project Management - Complete Construction Management, Design, Quality Control, Contracts, Management Shakti Hydro Project Limited, Delhi Commenced: October 2014
Detailed survey and final layout Design of the Project completed.
Detailed design in Progress.
Construction likely to be taken up by April 2018.
5 Karnah Hydroelectric Project (12 MW) in J&K Development of EPC Contract Documents and support in tendering process – Our scope limited to civil works portion only. Synergics India Private Limited, Noida Commenced: October 2014
Submitted: December 2014
Reviews up to July 2017
Tenders floated in July 2017. Pre-bid queries responded.
6 Kho 9 (45 MW) and Simar-I (48 MW) Hydro Electric Projects in Kullu, HP Development of EPC Contract Documents and tendering process
– Our scope limited to civil works portion only.
SJVN Arun-III Power Development Company Pvt. Ltd., Noida Commenced: May 2016
Finalization of Contracts in Progress
Project Execution likely to commence by Jan 2019.
7 Purulia Pumped Storage Project (900 MW) in West Bengal Development of Rehabilitation and Resettlement (R&R) Plans for Project Affected People West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) Commenced: January 2017
Report Submission in Progress
Final Approval expected by Dec 2018.
8 Dibang Multipurpose Project (3000 MW) in Arunachal Pradesh Development of Disaster Management and Risk Mitigation Plans NHPC Limited Commenced: February 2018
Final Submission Completed by August 2018.
Reviews ongoing at MoEFCC.
9 Dugar Hydroelectric Project (421 MW) in Himachal Pradesh Development of Infrastructure Planning and Construction Methodology, Construction Schedule and Design Support for design of underground structures (tunnels and caverns) and RCC Structures. AF Consult, Noida
Dugar Hydro Power Limited
Commenced: July 2014
Submitted: September 2014
DPR Submitted: August 2015
10 Lower Kalnai Hydroelectric Project (45 MW) in Jammu and Kashmir Development of Infrastructure Planning, Construction Schedule and Design Support. Consultant: AF Consult
EPC Contractor: Coastal Projects Limited
Owner: JKSPDC, J&K
Commenced: July 2014
EPC Contractor: Coastal Projects Limited
Submitted: September 2014
Finalized: November 2014
11 Kutehr Hydroelectric Project (240 MW) in J&K Development of EPC Contract Documents and support in tendering process. Main Consultant: Entura Hydro Tasmania
Owner: JSW (Jindal Steel Works)
Commenced: November 2014
Submitted: November 2014
RFP Issued: January 2015
Pre-bid procedures and Bid evaluation completed
12 Luj Small Hydroelectric Project Preparation of Detailed Project Report, Excluding Survey and Investigations and Geology and Hydrology. Consultant: AF Consult
Owner: Dugar Hydro Power Limited
PFR Submitted to Him Urja
DPR under Preparation
13 Water Treatment Plant and Pumping Station (14 MLD) at Shapur Kandi HEP Conceptual Design of 14 MLD Water Treatment Plant and Pumping Station. PHE, Punjab Completed
14 Upper Karnali Hydroelectric Project (900 MW), Nepal Review of design and drawings, Development of Construction Methodology, quantities calculations for revised drawings and Review of Costs. GMR Upper Karnali Hydro Power Limited Construction Methodology and Complete costing submitted. Under review by the client.
15 Augmentation of LWSS Water Supply Scheme, Chail, Mandi, HP Structural Design of Water Tanks. I&PH, Gohar, Himachal Pradesh Completed
16 14 numbers of 132/33/11 kV Substation in Bihar Project Management and Construction Supervision Skipper SEIL (India) Pvt. Ltd. Gurgaon Started: December 2015 (6 months term)
Erection, testing and commissioning of 4 Nos. of 50 MVA Transformers and 132/33 bays
Withdrawn: May 2016 (payment issues)
17 Phulibagar and Burthing Hydroelectric Project Preparation of General Draft Tender Documents. Essel Infraprojects Private Limited Started: May 2016
Completed and submitted
18 Konda Hydroelectric Project Development of Construction Methodology, quantities calculations and Costing for Tendering. DMR Hydro Engineers P. L. Faridabad
Prime Assigner : KRK Infracon, Hyderabad
Started: October 2016
Completed and tender submitted
19 Modification and Strengthening of Existing Cargo Berths No. 1 To 6 At Kandla Preparation of Claim Documents Bumi Geo Engineering Ltd. Documentation Complete
Arbitration Proceedings in Progress
20 Providing and laying Trunk Sewer line in colonies of the Constituency: Part of Gokulpur and Part of Karawal Nagar falling under Yamuna Vihar WWTP Catchment area through Trenchless Technology in Delhi Preparation of Tender Documents and support services. Bumi Geo Engineering Ltd. Documentation Complete
Tender Submitted
21 Single Line BG Tunnel 12 from Km 63.626 To Km 68.320 In between Khongsang – Tupul Preparation of Claim Documents Coastal Projects Limited Dec.’17 to Feb.’17 Draft Documentation Complete. Reviewed by Coastal completed.
22 Bangalore Water Supply and Sewerage Project (II) Contract S1d - Sewage Treatment Plant (90 MLD) at Bellandur Amanikere, Bengaluru Quantity Survey and Project Scheduling and Monitoring VA Tech WABAG Commenced: July 2017; ongoing
23 Sewage Treatment Plant and Pumping Stations In Odisha (48 MLD) Bhubneshwar Sewerage District –VI Quantity Survey and Project Scheduling and Monitoring VA Tech WABAG Commenced: July 2017; ongoing
24 Boali – 2 HEPs Project (12 MW Augmentation), Boali, Province Ombella-M’poko, Central African Republic (CAR) Development of Construction Methodology, quantities calculations, and Costing for Tendering ENERGIE CENTRAFRICAINE Started: October 2017; Completed and tender submitted
25 Effluent Treatment Plant – C2 ETP Complex, Reliance Programme 3, Jamnagar Quantity Survey for final quantity calculations, verifying contractors’ Bills and Payments, reconciliation of quantities paid and actual, analysing time and cost variation VA Tech WABAG Commenced: December 2017; Final Report submitted: March 26, 2018
26 Preparation of Dam Safety Guidelines for Laos PDR Preparation of Dam Safety Guidelines Entura Hydro Tasmania Major works completed. Review by World Bank team and others in progress. Major clarifications provided. Almost in final stage.
27 Teesta HE Project Phase - VI Costing for Tender DMR Hydro for Statkraft, Norway Completed and submitted to the Client for consideration in Bid
28 Improvement and widening to four lane with paved shoulder of Manu - Simlung section of NH-44A in the state of Tripura on EPC mode – package - III starting near Kanchanpur at km 46.597 and ending near Vaghmun at km 66.845 Costing for Tender Vensar Construction Co. Ltd., Hyderabad Completed and submitted to the Client for consideration in Bid: January 2019
29 Improvement & widening of Kailashahar- Teliamura section of NH-208 package-VI from km 105.300 (design chainage 97.319) to km 139.453 (design chainage 127.319) in Tripura Costing for Tender Vensar Construction Co. Ltd., Hyderabad Completed and submitted to the Client for consideration in Bid: January 2019
30 Kholongchhu Hydroelectric Project (600 MW), Trashiyangtse, Bhutan, Package: KC – 1 Construction Planning, Scheduling, Methodology and Costing for tender/ bid Energy Infratech Pvt. Ltd., Noida Completed and submitted to the Client for consideration in Bid: March 2019
31 Kholongchhu Hydroelectric Project (600 MW): Package: KC – 2 Construction Planning, Scheduling, Methodology and Costing for tender/ bid Energy Infratech Pvt. Ltd., Noida Completed and submitted to the Client for consideration in Bid in March 2019.
32 Kholongchhu Hydroelectric Project (600 MW): Package: KC – 3 Construction Planning, Scheduling, Methodology and Costing for tender/ bid Energy Infratech Pvt. Ltd., Noida Completed and submitted to the Client for consideration in Bid in May 2019.
33 Kutehr Hydroelectric Project (240 MW): Himachal Pradesh, India: Package JSWEKL/ Lot-2 Construction Planning, Scheduling, Methodology and Costing for tender/ bid MF Bumi Geotech Private Limited Completed and submitted to the Client for consideration in Bid in June 2019.
34 Stabilization of Slopes at Nirgad near Rishikesh, Jawadi near Rudraprayag and Padli near Nainital Development of Construction Schedule, Construction Methodology, QA&QC Plan, and HSE Plan MF Bumi Geotech Private Limited Completed and submitted to the Client for consideration in Bid in July 2019.
35 Lower Hewakhola Hydroelectric Project, Nepal Preparation of response to arbitration claims and counter claims Mountain Hydro Nepal Ltd. July August 2019
36 Kutehr Hydroelectric Project (240 MW): Himachal Pradesh, India: Package JSWEKL/ Lot-2 (Described above) Review of Construction, Schedules, Equipment Planning, Manpower Planning and technical and commercial discussions with Suppliers MF Bumi Geotech Private Limited Ongoing
37 Bajoli Holi Hydroelectric Project 180 MW Due diligence on Technical aspects of construction and quality and balance costs for taking stakes in the Project STATKRAFT India Pvt. Ltd. Completed in Dec. 2019
38 Design and construction of Broad Gauge Ballast-Less Track Preparation of Claims against Expenses and losses suffered due to delays and incompletion of Works Royal-CPL JV Completed January 2020
39 Rehabilitation and Upgradation of NH-66 Design of MEP System including Ventilation, Illumination, safety and Plumbing etc for Tunnel Shinde Developers, Pune Work in Progress: Report submitted. Review comments/ observations awaited
40 Construction of BG Tunnel no. T-12 from Ch. 105840 to 115391 Preparation of Claims against Expenses and losses suffered due to delays and incompletion of Works HCC-CPL JV Work in Progress: Claims Submitted. Review comments/ observations awaited
41 Kashedi Ghat 6 Lane 2m long Twin Tube Tunnel Maharashtra, India Mechanical Electrical and Plumbing Design For Twin Tube Tunnels Shinde Developers, Pune Work Completed and approved by Authority
42 Construction of Eight Lane Access Controlled Expressway from Km 69.800 to Km 79.783 Construction Planning, Scheduling, Methodology and Costing for tender/ bid including Quantity Assessment and Analysis of Rates IRCON International Work Completed
43 Kutehr Hydroelectric Project (240 MW) Due Diligence for Project Status suggesting balance quantities, realistic construction schedule costs and cashflows, problem areas and remedies DMR Hydroengineering & Infrastructures Ltd. Work Completed
44 Rangit-II Hydroelectric Project Construction Prospects of the Project; Construction Methodology and Construction Schedule, Cost Estimates including Quantity Assessment and Analysis of Rates STATKRAFT India Pvt. Ltd. Completed
45 Design, Planning and Methodology for Right Bank Protection of Rangit River Phase-I: Design, Planning and Methodology for River Bank Protection immediate upstream of Dam on Left Bank DANS Energy Pvt. Limited Phase-I Completed. Phase-II Completed in March 2024
46 Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnels Construction, Planning, Scheduling, Methodology and Costing for tender/ bid including Quantity Assessment and Analysis of Rates JMC Projects India Limited Completed; Bid submitted
47 Deothal Chanju Hep (30.5 MW) Civil & Hm Works Package Construction, Planning, Scheduling, Methodology and Costing for tender/ bid and Analysis of Rates Subhash Infrastructures Pvt. Limited Completed and submitted to the client
48 Arakot-Tiuni Hydroelectric Project District Himachal Pradesh Design of Barrage, Construction, Planning, Scheduling and Methodology for DPR review Sharp Hydroengineering Pvt. Limited Completed and submitted to the client
49 Three Dam Projects in Odisha Pre-Bid Engineering Support, Construction Planning, Scheduling, Methodology and Costing for tender/ bid Sharp Hydroengineering Pvt. Limited Completed
50 Design of Helicopter Hanger 40 m x 24m x 10m in Uttarakhand Complete Structural design including foundation Completed
51 Adwa off-stream closed loop pump storage project (920 mw)
District Mirzapur, Uttar Pradesh
Reservoir Planning, Project Layout, Construction Planning, Scheduling, Methodology and Costing for feasibility study. Main Consultant: Aquagreen Engineering Management Private Limited and Sharp Hydroengineering Pvt. Limited Completed
52 Musakhand off-stream closed loop pump storage project (500 mw) Reservoir Planning, Project Layout, Construction Planning, Scheduling, Methodology and Costing for feasibility study. Aquagreen Engineering Management Private Limited and Sharp Hydroengineering Pvt. Limited Completed
53 Design of Steel Surge Shaft Structure 7.5 m Dia, 15 m High with RCC Foundation for Likhu-1 HEP (77 MW) in Nepal Complete Structural design including foundation MV Dugar Group, Nepal Completed and submitted in June 2023.
54 Largi HEP (3x42 MW), Distt- Mandi, Himachal Pradesh Design, Fabrication, Supply and installation of Hinged Gate of size 5.0m x5.5m at Main Access Tunnel (MAT) and 4.0mx4.0m at Emergency Exit Tunnel (EET) including associated civil works to prevent flooding in underground Power House Sharp Hydroengineering Pvt. Limited Completed and submitted in December 2023.
55 Daudhan Dam under Ken-Betwa Link Project (103 MW), Madhya Pradesh Pre-Bid Engineering design of Dam and Spillway Structure including design memos and drawings. Hindustan Consulting Associates Completed and submitted in December 2023.
56 Bhashmey Hydroelectric Project (62 MW) Rangpo, District Pakyong, Sikkim, India Construction Planning, Scheduling and Methodology. Statkraft India Pvt. Limited Completed and submitted in October 2023.
57 Barnigad SHP (22.80 MW), Uttarakhand Design Flood and Hydraulic Design of the Barrage and provided the design memos and drawings Hindustan Consulting Associates Completed and submitted in March 2024.
58 Phata - Byung Hydroelectric Project (76 MW), District Rudra Prayag, Uttarakhand, India Construction Planning, Scheduling, Methodology and Infrastructure Planning. Statkraft India Pvt. Limited Completed and submitted in March 2024.
59 Dugar Hydrolectric Project (500 MW), District Chamba, Himachal Pradesh, India Construction and equipment Planning, Scheduling and Methodology for tender. Vensar Projects Limited Completed and submitted in July 2024.
60 Teesta-V Hydroelectric Project (510 MW), Sikkim, India Construction and equipment Planning, Scheduling and Methodology for modification of DT in to Spillway Tunnel, for tender. Vensar Projects Limited Completed and submitted in July 2024.
For and on behalf of Saral Nirmanika Private Limited
Director (V. K. Srivastava)