Major Works Undertaken (Status as on 30.09.2024)
S. No. | Name of Project | Assignment to SNPL | Client | Current Status | |
1 | Sawalkot Hydroelectric Project (1856 MW) in Jammu and Kashmir | Development of Construction Methodology and Review of Costs for DPR | DMR Hydro Engineers P. L. Faridabad
Prime Assigner: Hindustan Construction Co., Mumbai |
Commenced on: March 2013 Prime Assigner: Hindustan Construction Co., Mumbai Submitted on: June 2013 DPR Submitted to CWC. Reviews in Progress. |
|
2 | Ubahrah Small Hydroelectric Project (2.4 MW) in Chuwari, Chamba, HP | Project Management - Construction Supervision, Quality Control, Contracts and Billing, Management, Procurement of Major Construction Material and Equipment | Shakti Hydro Project Limited |
Commenced on: April 2013 The Project completed and commissioned on 18th Nov. 2014. Design of additional water conducting system completed in March 2017. Construction in progress. |
|
3 | Katende Hydroelectric Project (60 MW) | Project Planning - Development of Construction Methodology, Equipment Planning, Manpower Planning | Tractebel Engineering Pvt. Ltd. Delhi |
Commenced: April 2013 Submitted: June 2013 |
|
4 | Chachyote Small Hydroelectric Project (3.5 MW) in Mandi, HP | Project Management - Complete Construction Management, Design, Quality Control, Contracts, Management | Shakti Hydro Project Limited, Delhi |
Commenced: October 2014 Detailed survey and final layout Design of the Project completed. Detailed design in Progress. Construction likely to be taken up by April 2018. |
|
5 | Karnah Hydroelectric Project (12 MW) in J&K | Development of EPC Contract Documents and support in tendering process – Our scope limited to civil works portion only. | Synergics India Private Limited, Noida |
Commenced: October 2014 Submitted: December 2014 Reviews up to July 2017 Tenders floated in July 2017. Pre-bid queries responded. |
|
6 | Kho 9 (45 MW) and Simar-I (48 MW) Hydro Electric Projects in Kullu, HP |
Development of EPC Contract Documents and tendering process – Our scope limited to civil works portion only. |
SJVN Arun-III Power Development Company Pvt. Ltd., Noida |
Commenced: May 2016 Finalization of Contracts in Progress Project Execution likely to commence by Jan 2019. |
|
7 | Purulia Pumped Storage Project (900 MW) in West Bengal | Development of Rehabilitation and Resettlement (R&R) Plans for Project Affected People | West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) |
Commenced: January 2017 Report Submission in Progress Final Approval expected by Dec 2018. |
|
8 | Dibang Multipurpose Project (3000 MW) in Arunachal Pradesh | Development of Disaster Management and Risk Mitigation Plans | NHPC Limited |
Commenced: February 2018 Final Submission Completed by August 2018. Reviews ongoing at MoEFCC. |
|
9 | Dugar Hydroelectric Project (421 MW) in Himachal Pradesh | Development of Infrastructure Planning and Construction Methodology, Construction Schedule and Design Support for design of underground structures (tunnels and caverns) and RCC Structures. | AF Consult, Noida Dugar Hydro Power Limited |
Commenced: July 2014 Submitted: September 2014 DPR Submitted: August 2015 |
|
10 | Lower Kalnai Hydroelectric Project (45 MW) in Jammu and Kashmir | Development of Infrastructure Planning, Construction Schedule and Design Support. | Consultant: AF Consult EPC Contractor: Coastal Projects Limited Owner: JKSPDC, J&K |
Commenced: July 2014 EPC Contractor: Coastal Projects Limited Submitted: September 2014 Finalized: November 2014 |
|
11 | Kutehr Hydroelectric Project (240 MW) in J&K | Development of EPC Contract Documents and support in tendering process. | Main Consultant: Entura Hydro Tasmania Owner: JSW (Jindal Steel Works) |
Commenced: November 2014 Submitted: November 2014 RFP Issued: January 2015 Pre-bid procedures and Bid evaluation completed |
|
12 | Luj Small Hydroelectric Project | Preparation of Detailed Project Report, Excluding Survey and Investigations and Geology and Hydrology. | Consultant: AF Consult Owner: Dugar Hydro Power Limited |
PFR Submitted to Him Urja DPR under Preparation |
|
13 | Water Treatment Plant and Pumping Station (14 MLD) at Shapur Kandi HEP | Conceptual Design of 14 MLD Water Treatment Plant and Pumping Station. | PHE, Punjab | Completed | |
14 | Upper Karnali Hydroelectric Project (900 MW), Nepal | Review of design and drawings, Development of Construction Methodology, quantities calculations for revised drawings and Review of Costs. | GMR Upper Karnali Hydro Power Limited | Construction Methodology and Complete costing submitted. Under review by the client. | |
15 | Augmentation of LWSS Water Supply Scheme, Chail, Mandi, HP | Structural Design of Water Tanks. | I&PH, Gohar, Himachal Pradesh | Completed | |
16 | 14 numbers of 132/33/11 kV Substation in Bihar | Project Management and Construction Supervision | Skipper SEIL (India) Pvt. Ltd. Gurgaon | Started: December 2015 (6 months term) Erection, testing and commissioning of 4 Nos. of 50 MVA Transformers and 132/33 bays Withdrawn: May 2016 (payment issues) |
|
17 | Phulibagar and Burthing Hydroelectric Project | Preparation of General Draft Tender Documents. | Essel Infraprojects Private Limited | Started: May 2016 Completed and submitted |
|
18 | Konda Hydroelectric Project | Development of Construction Methodology, quantities calculations and Costing for Tendering. | DMR Hydro Engineers P. L. Faridabad Prime Assigner : KRK Infracon, Hyderabad |
Started: October 2016 Completed and tender submitted |
|
19 | Modification and Strengthening of Existing Cargo Berths No. 1 To 6 At Kandla | Preparation of Claim Documents | Bumi Geo Engineering Ltd. | Documentation Complete Arbitration Proceedings in Progress |
|
20 | Providing and laying Trunk Sewer line in colonies of the Constituency: Part of Gokulpur and Part of Karawal Nagar falling under Yamuna Vihar WWTP Catchment area through Trenchless Technology in Delhi | Preparation of Tender Documents and support services. | Bumi Geo Engineering Ltd. | Documentation Complete Tender Submitted |
|
21 | Single Line BG Tunnel 12 from Km 63.626 To Km 68.320 In between Khongsang – Tupul | Preparation of Claim Documents | Coastal Projects Limited | Dec.’17 to Feb.’17 Draft Documentation Complete. Reviewed by Coastal completed. | |
22 | Bangalore Water Supply and Sewerage Project (II) Contract S1d - Sewage Treatment Plant (90 MLD) at Bellandur Amanikere, Bengaluru | Quantity Survey and Project Scheduling and Monitoring | VA Tech WABAG | Commenced: July 2017; ongoing | |
23 | Sewage Treatment Plant and Pumping Stations In Odisha (48 MLD) Bhubneshwar Sewerage District –VI | Quantity Survey and Project Scheduling and Monitoring | VA Tech WABAG | Commenced: July 2017; ongoing | |
24 | Boali – 2 HEPs Project (12 MW Augmentation), Boali, Province Ombella-M’poko, Central African Republic (CAR) | Development of Construction Methodology, quantities calculations, and Costing for Tendering | ENERGIE CENTRAFRICAINE | Started: October 2017; Completed and tender submitted | |
25 | Effluent Treatment Plant – C2 ETP Complex, Reliance Programme 3, Jamnagar | Quantity Survey for final quantity calculations, verifying contractors’ Bills and Payments, reconciliation of quantities paid and actual, analysing time and cost variation | VA Tech WABAG | Commenced: December 2017; Final Report submitted: March 26, 2018 | |
26 | Preparation of Dam Safety Guidelines for Laos PDR | Preparation of Dam Safety Guidelines | Entura Hydro Tasmania | Major works completed. Review by World Bank team and others in progress. Major clarifications provided. Almost in final stage. | |
27 | Teesta HE Project Phase - VI | Costing for Tender | DMR Hydro for Statkraft, Norway | Completed and submitted to the Client for consideration in Bid | |
28 | Improvement and widening to four lane with paved shoulder of Manu - Simlung section of NH-44A in the state of Tripura on EPC mode – package - III starting near Kanchanpur at km 46.597 and ending near Vaghmun at km 66.845 | Costing for Tender | Vensar Construction Co. Ltd., Hyderabad | Completed and submitted to the Client for consideration in Bid: January 2019 | |
29 | Improvement & widening of Kailashahar- Teliamura section of NH-208 package-VI from km 105.300 (design chainage 97.319) to km 139.453 (design chainage 127.319) in Tripura | Costing for Tender | Vensar Construction Co. Ltd., Hyderabad | Completed and submitted to the Client for consideration in Bid: January 2019 | |
30 | Kholongchhu Hydroelectric Project (600 MW), Trashiyangtse, Bhutan, Package: KC – 1 | Construction Planning, Scheduling, Methodology and Costing for tender/ bid | Energy Infratech Pvt. Ltd., Noida | Completed and submitted to the Client for consideration in Bid: March 2019 | |
31 | Kholongchhu Hydroelectric Project (600 MW): Package: KC – 2 | Construction Planning, Scheduling, Methodology and Costing for tender/ bid | Energy Infratech Pvt. Ltd., Noida | Completed and submitted to the Client for consideration in Bid in March 2019. | |
32 | Kholongchhu Hydroelectric Project (600 MW): Package: KC – 3 | Construction Planning, Scheduling, Methodology and Costing for tender/ bid | Energy Infratech Pvt. Ltd., Noida | Completed and submitted to the Client for consideration in Bid in May 2019. | |
33 | Kutehr Hydroelectric Project (240 MW): Himachal Pradesh, India: Package JSWEKL/ Lot-2 | Construction Planning, Scheduling, Methodology and Costing for tender/ bid | MF Bumi Geotech Private Limited | Completed and submitted to the Client for consideration in Bid in June 2019. | |
34 | Stabilization of Slopes at Nirgad near Rishikesh, Jawadi near Rudraprayag and Padli near Nainital | Development of Construction Schedule, Construction Methodology, QA&QC Plan, and HSE Plan | MF Bumi Geotech Private Limited | Completed and submitted to the Client for consideration in Bid in July 2019. | |
35 | Lower Hewakhola Hydroelectric Project, Nepal | Preparation of response to arbitration claims and counter claims | Mountain Hydro Nepal Ltd. | July August 2019 | |
36 | Kutehr Hydroelectric Project (240 MW): Himachal Pradesh, India: Package JSWEKL/ Lot-2 (Described above) | Review of Construction, Schedules, Equipment Planning, Manpower Planning and technical and commercial discussions with Suppliers | MF Bumi Geotech Private Limited | Ongoing | |
37 | Bajoli Holi Hydroelectric Project 180 MW | Due diligence on Technical aspects of construction and quality and balance costs for taking stakes in the Project | STATKRAFT India Pvt. Ltd. | Completed in Dec. 2019 | |
38 | Design and construction of Broad Gauge Ballast-Less Track | Preparation of Claims against Expenses and losses suffered due to delays and incompletion of Works | Royal-CPL JV | Completed January 2020 | |
39 | Rehabilitation and Upgradation of NH-66 | Design of MEP System including Ventilation, Illumination, safety and Plumbing etc for Tunnel | Shinde Developers, Pune | Work in Progress: Report submitted. Review comments/ observations awaited | |
40 | Construction of BG Tunnel no. T-12 from Ch. 105840 to 115391 | Preparation of Claims against Expenses and losses suffered due to delays and incompletion of Works | HCC-CPL JV | Work in Progress: Claims Submitted. Review comments/ observations awaited | |
41 | Kashedi Ghat 6 Lane 2m long Twin Tube Tunnel Maharashtra, India | Mechanical Electrical and Plumbing Design For Twin Tube Tunnels | Shinde Developers, Pune | Work Completed and approved by Authority | |
42 | Construction of Eight Lane Access Controlled Expressway from Km 69.800 to Km 79.783 | Construction Planning, Scheduling, Methodology and Costing for tender/ bid including Quantity Assessment and Analysis of Rates | IRCON International | Work Completed | |
43 | Kutehr Hydroelectric Project (240 MW) | Due Diligence for Project Status suggesting balance quantities, realistic construction schedule costs and cashflows, problem areas and remedies | DMR Hydroengineering & Infrastructures Ltd. | Work Completed | |
44 | Rangit-II Hydroelectric Project | Construction Prospects of the Project; Construction Methodology and Construction Schedule, Cost Estimates including Quantity Assessment and Analysis of Rates | STATKRAFT India Pvt. Ltd. | Completed | |
45 | Design, Planning and Methodology for Right Bank Protection of Rangit River | Phase-I: Design, Planning and Methodology for River Bank Protection immediate upstream of Dam on Left Bank | DANS Energy Pvt. Limited | Phase-I Completed. Phase-II Completed in March 2024 | |
46 | Construction of Uni-directional Sudhmahadev – Dranga Twin Tube Tunnels | Construction, Planning, Scheduling, Methodology and Costing for tender/ bid including Quantity Assessment and Analysis of Rates | JMC Projects India Limited | Completed; Bid submitted | |
47 | Deothal Chanju Hep (30.5 MW) Civil & Hm Works Package | Construction, Planning, Scheduling, Methodology and Costing for tender/ bid and Analysis of Rates | Subhash Infrastructures Pvt. Limited | Completed and submitted to the client | |
48 | Arakot-Tiuni Hydroelectric Project District Himachal Pradesh | Design of Barrage, Construction, Planning, Scheduling and Methodology for DPR review | Sharp Hydroengineering Pvt. Limited | Completed and submitted to the client | |
49 | Three Dam Projects in Odisha | Pre-Bid Engineering Support, Construction Planning, Scheduling, Methodology and Costing for tender/ bid | Sharp Hydroengineering Pvt. Limited | Completed | |
50 | Design of Helicopter Hanger 40 m x 24m x 10m in Uttarakhand | Complete Structural design including foundation | Completed | ||
51 | Adwa off-stream closed loop pump storage project (920 mw)
District Mirzapur, Uttar Pradesh |
Reservoir Planning, Project Layout, Construction Planning, Scheduling, Methodology and Costing for feasibility study. | Main Consultant: Aquagreen Engineering Management Private Limited and Sharp Hydroengineering Pvt. Limited | Completed | |
52 | Musakhand off-stream closed loop pump storage project (500 mw) | Reservoir Planning, Project Layout, Construction Planning, Scheduling, Methodology and Costing for feasibility study. | Aquagreen Engineering Management Private Limited and Sharp Hydroengineering Pvt. Limited | Completed | |
53 | Design of Steel Surge Shaft Structure 7.5 m Dia, 15 m High with RCC Foundation for Likhu-1 HEP (77 MW) in Nepal | Complete Structural design including foundation | MV Dugar Group, Nepal | Completed and submitted in June 2023. | |
54 | Largi HEP (3x42 MW), Distt- Mandi, Himachal Pradesh | Design, Fabrication, Supply and installation of Hinged Gate of size 5.0m x5.5m at Main Access Tunnel (MAT) and 4.0mx4.0m at Emergency Exit Tunnel (EET) including associated civil works to prevent flooding in underground Power House | Sharp Hydroengineering Pvt. Limited | Completed and submitted in December 2023. | |
55 | Daudhan Dam under Ken-Betwa Link Project (103 MW), Madhya Pradesh | Pre-Bid Engineering design of Dam and Spillway Structure including design memos and drawings. | Hindustan Consulting Associates | Completed and submitted in December 2023. | |
56 | Bhashmey Hydroelectric Project (62 MW) Rangpo, District Pakyong, Sikkim, India | Construction Planning, Scheduling and Methodology. | Statkraft India Pvt. Limited | Completed and submitted in October 2023. | |
57 | Barnigad SHP (22.80 MW), Uttarakhand | Design Flood and Hydraulic Design of the Barrage and provided the design memos and drawings | Hindustan Consulting Associates | Completed and submitted in March 2024. | |
58 | Phata - Byung Hydroelectric Project (76 MW), District Rudra Prayag, Uttarakhand, India | Construction Planning, Scheduling, Methodology and Infrastructure Planning. | Statkraft India Pvt. Limited | Completed and submitted in March 2024. | |
59 | Dugar Hydrolectric Project (500 MW), District Chamba, Himachal Pradesh, India | Construction and equipment Planning, Scheduling and Methodology for tender. | Vensar Projects Limited | Completed and submitted in July 2024. | |
60 | Teesta-V Hydroelectric Project (510 MW), Sikkim, India | Construction and equipment Planning, Scheduling and Methodology for modification of DT in to Spillway Tunnel, for tender. | Vensar Projects Limited | Completed and submitted in July 2024. | |
For and on
behalf of
Saral Nirmanika
Private Limited
Director (V. K. Srivastava) |