Major Works Undertaken (Status as on 30.06.2020)

S. No.Name of ProjectAssignment to SNPLClientCurrent Status
1.Sawalkot Hydroelectric Project (1856 MW) in Jammu and KashmirDevelopment of Construction Methodology and Review of Costs for DPR.

DMR Hydro Engineers P. L. Faridabad

Prime Assigner: Hindustan Construction Co., Mumbai

Commenced on: March 2013

Submitted on: June 2013

DPR Submitted to CWC.

Reviews in Progress.

2.Ubharah Small Hydroelectric Project (2.4 MW) in Chuwari, Chamba, HPProject Management- Construction Supervision, Quality Control, Contracts and Billing, Management, Procurement of Major Construction material and equipment.Shakti Hydro Project Limited

Commenced on: April 2013

The Project completed and commissioned on 18th Nov. 2014.

Design of additional water conducting system completed I March 2017. Construction in progress.

3.Katende Hydroelectric Project (60 MW)Project Planning -Development of construction methodology, Equipment Planning, Manpower PlanningTractebel Engineering Pvt. Ltd. Delhi

Commenced: April 2013

Submitted: June 2013

4.Chachyote Small Hydroelectric Project (3.5 MW) in Mandi, HPProject Management- Complete Construction management, Design, Quality Control, Contracts, Management,Shakti Hydro Project Limited, Delhi

Commenced: October 2014

Detailed survey and final layout Design of the Project completed. Detailed design in Progress. Construction likely to be taken up by April 2018.

5.

Karnah Hydroelectric Project (12 MW)

in J&K

Development of EPC Contract Documents and support in tendering process –Our scope limited to civil works portion only.Synergics India PrivateLimited. Noida

Commenced: October 2014

Submitted: December 2014; Reviews up to July 2017

Tenders floated in July 2017. Pre bid queries responded.

6.

Chavuma Small Hydroelectric Project (14 MW)

in Zambia

Project Review and assessment for Bidding on BOO BasisSIC P. L. Zambia

Commenced: February 2014

Report Submitted: February 2014

7.Tamu Hydro Electric Project in MyanmarProject Appraisal and Development of Construction Methodology.Sharp Engineering P. L. Faridabad

Commenced: November 2014

Report Submitted:January 2014

8.North Yammar Hydro Electric Project Stage-II (2.4 MW capacity enhancement) in MyanmarProject Appraisal and Development of Construction Methodology, Design support.Sharp Engineering P. L. FaridabadCompleted and submitted to the Client.
9.Dugar Hydroelectric Project (421 MW)in Himachal PradeshDevelopment of Infrastructure Planning and Construction Methodology, Construction Schedule and Design Support.

Consultant: AF Consult, Noida

Owner: Dugar Hydro Power Limited

Commenced in July 2014

Submitted:September 2014

DPR Submitted in August 2015.

10.Lower Kalnai Hydroelectric Project (45 MW)in Jammu and Kashmir.Development of Infrastructure Planning, Construction Scheduleand Design Support.

Consultant: AF Consult

EPC Contractor: Coastal Projects Limited

Owner: JKSPDC, J&K

Commenced in July 2014

Submitted: September 2014

Finalized in November 2014.

11.Kutehr Hydroelectric Project (240 MW)in J&KDevelopment of EPC Contract Documents and support in tendering process

Main Consultant: Entura Hydro Tasmania

Owner: JSW (Jindal Steel Works}

Commenced: November 2014

Submitted :November 2014

RFP (Request for Proposal Issued in January 2015.

Pre-bid procedures and Bid evaluation completed.

12.Luj Small Hydroelectric ProjectPreparation of Detailed Project Report, Excluding, Survey and Investigations and Geology and Hydrology.

Consultant:

AF Consult

Owner: Dugar Hydro Power Limited

PFR Submitted to Him Urja.

DPR under Preparation.

13.Water Treatment Plant and Pumping Station (14 MLD) at Shapur Kandi HEP.Conceptual Design of 14 MLD Water Treatment Plant and Pumping Station.PHE, PunjabCompleted
14.Upper Karnali Hydroelectric Project (900 MW), NepalReview of design and drawings, Development of Construction Methodology, quantities calculations for revised drawingsand Review of Costs.GMR Upper Karnali Hydro Power Limited.Construction Methodology and Complete costing submitted. Under review by the client.
15.Augmentation of LWSS Water Supply Scheme, Chail, Mandi, HPStructural Design of Water TanksI&PH, Gohar, Himachal PradeshCompleted.
16.14 numbers of 132/33/11 kV Substation in BiharProject Management and Construction SupervisionSkipper SEIL (India) Pvt. Ltd.  Gurgaon.

Started from December 2015. Term 6 Months.

Erection, testing and commissioning (Successfully Charging Charging) 4 Nos. of 50 MVA Transformers and a number of 132/33 bays.

Work was in Progress. Withdrawn by SNPLin May 2016 due to payment related and other issues.

17.

Phulibagar and Burthing Hydroelectric Project

(Two projects)

Preparation of General Draft Tender DocumentsEssel Infraprojects Private Limited.Started from May 2016. Work Completed and submitted and accepted by the client.
18.Konda Hydroelectric ProjectDevelopment of Construction Methodology,quantities calculations and Costing for Tendering.

DMR Hydro Engineers P. L. Faridabad

Prime Assigner :KRK Infracon, Hyderabad

Started from October 2016. Work Completed and tender submitted.
19.Modification and Strengthening of Existing Cargo Berths No. 1 To 6 At KandlaPreparation of Claim DocumentsBumi Geo Engineering Ltd.Documentation Complete. Arbitration Proceedings in Progress.
20.Providing and laying Trunk Sewer line in colonies of the Constituency: Part of Gokulpur and Part of Karawal Nagar falling under Yamuna Vihar WWTP Catchment area through Trenchless Technology in DelhiPreparation of Tender Documents and support services.Bumi Geo Engineering Ltd.Documentation Complete. Tender Submitted.
21.Single Line BG Tunnel 12 from Km 63.626 To Km 68.320 In between Khongsang – TupulPreparation of Claim DocumentsCoastal Projects Limited.Dec.’17 to Feb.’17 Draft Documentation Complete. Reviewed by Coastal completed.
22.Bangalore Water Supply and Sewerage Project (II) Contract S1d – Sewage Treatment Plant (90 mld) at Bellandur Amanikere, BangaluruQuantity Survey and Project Scheduling and MonitoringVA Tech WABAGCommenced in July 2017; on going
23.Sewage Treatment Plant and Pumping Stations In Odisha(48 mld) Bhubneshwar Sewrage District –VIQuantity Survey and Project Scheduling and MonitoringVA Tech WABAGCommenced in July 2017; on going
24.Boali – 2 HEPs Project 12 MW Augmentation) Boali,Province Ombella-M’poko, Central African Republic (CAR)Development of Construction Methodology, quantities calculations and Costing for TenderingPrime Assigner: ENERGIE CENTRAFRICAINEStarted from October 2017. Work Completed and tender submitted.
25.Effluent Treatment Plant –C2 ETP Complex, Reliance Programme 3,JamnagarQuantity Survey for final quantity calculations and verifying the contractors Bills and Payments, reconciliation of quantities paid and actual, analysing time and cost variation.VA Tech WABAGCommenced in December 2017; Final Report submitted on 26th March 2018.
26.Preparation of Dam Safety Guidelines for Laos PDRPreparation of Dam Safety Guidelines for Laos PDREntura Hydro TasmaniaMajor works completed. Review by World Bank team and Others in progress. All major clarifications provided. Almost in final stage.
27.Teesta HE Project Phase – VICosting for TenderDMR Hydro for Statkraft, NorwayCompleted and submitted to the Client for consideration in Bid.
28.Improvement and widening to fourlane with paved shoulder of Manu – Simlung section of NH-44A in the state of Tripura on EPC mode – package – III starting near Kanchanpur at km 46.597 and ending near Vaghmun at km 66.845Costing for TenderVensar Construction Co. Ltd., HyderabadCompleted and submitted to the Client for consideration in Bid in January 2019.
29.Improvement & wideningof Kailashahar-Teliamura section of NH-208 package-VI from km 105.300(designchainage 97.319) to km 139.453 (design chainage 127.319)in TripuraCosting for TenderVensar Construction Co. Ltd., HyderabadCompleted and submitted to the Client for consideration in Bid in January 2019.
30.

Kholongchhu Hydroelectric Project (600 mw), Trashiyangtse, Bhutan, Package: KC – 1

Construction of river diversion works, dam intake,DesiltingArrangementand HRT from RD0.00 m to RD 2,303.00 m including construction adits.

Construction Planning, Scheduling, Methodology and Costing for tender/ bidEnergy Infratech Pvt. Ltd., NoidaCompleted and submitted to the Client for consideration in Bid in March 2019.
31.Kholongchhu Hydroelectric Project (600 mw): Package: KC – 2: Construction of Head Race Tunnel from RD 2303.00 m to RD 14091.07 m including construction adits II, III, IV, V and Chaplangchu Diversion WorksConstruction Planning, Scheduling, Methodology and Costing for tender/ bidEnergy Infratech Pvt. Ltd., NoidaCompleted and submitted to the Client for consideration in Bid in March 2019.
32.Kholongchhu Hydroelectric Project (600 Mw): Package: KC – 3: Construction of Head Race Tunnel from RD 14,091.07 m to RD 15762.80 m including construction adit VI Surge Shafts, Butterfly Valve Chamber, Pressure Shafts, Powerhouse Complex and Tail Race TunnelConstruction Planning, Scheduling, Methodology and Costing for tender/ bidEnergy Infratech Pvt. Ltd., NoidaCompleted and submitted to the Client for consideration in Bid in May 2019.
33.Kutehr Hydroelectric Project (240 Mw): Himachal Pradesh, India: Package JSWEKL/Lot-2: Civil Works for  Remaining Part of Headrace Tunnel (From Rd7500 m TO RD 14750 m), Surge Shaft, Pressure Shaft, Steel Liner, Underground Powerhouse, Underground Transformer Hall, Collection Gallery, Tailrace Tunnel and Pot Head Yard including Approach Roads & Dump YardsConstruction Planning, Scheduling, Methodology and Costing for tender/ bid.MF Bumi Geotech Private LimitedCompleted and submitted to the Client for consideration in Bid in June 2019.
34.Stabilization of Slopes at Nirgad near Rishikesh, Jawadi near Rudraprayag and Padli near Nainital Under Project for Natural Disaster Management in Forest Areas in UttarakhandDevelopment of Construction Schedule, Construction Methodology, QA&QC Plan, and HSE PlanMF Bumi Geotech Private LimitedCompleted and submitted to the Client for consideration in Bid in July 2019.
35.Lower Hewakhola Hydroelectric Project, Nepal.Preparation of response to arbitration claims and counter claimsMountain Hydro Nepal Ltd.July August 2019
36.Kutehr Hydroelectric Project (240 Mw): Himachal Pradesh, India: Package JSWEKL/Lot-2 (Described above)Review of Construction, Schedules, Equipment Planning, Manpower Planning and technical and commercial discussions with Suppliers.MF Bumi Geotech Private LimitedOn going
37.Bajoli Holi Hydroelectric Project 180 MW,Due diligence on Technical aspects of construction and quality and balance costs for taking stakes in the Project.STATKRAFT India Pvt. Ltd.Completed in Dec. 2019
38.Design and construction of Broad Gauge Ballast-Less Track under Contract Package 1 of 4 for Tunnel No.1 to 6, Contract Package 2 of 4 for Tunnel No. 6 to 11C and Contract Package 3 of 4 for Tunnel No. 12 to 18 and all other ancillary work in connection with construction of New BG Line in between Jiribam to Imphal.Preparation of Claims against Expenses and losses suffered due to delays and incompletion of Works.

Royal-CPL JV

A JV of Royal Infraconstru Limitedand Coastal Projects Limited. &

Completed January 2020.